 FPE Ref: 6693-240215-1.0



          6.4      BIOSECURITY MANAGEMENT

          Objective         Invasive plants listed under the Biosecurity Act 2014 are to be managed in a manner that minimises the risk of spread.

          Potential         ▪   Distribution of weed propagules into the drainage system and surrounding environment during construction.
          Impacts           ▪   The introduction of new pest plant species into the works area.
                            ▪   The spread of weeds to other parts of Australia through the transportation of impacted construction machinery from the site.

          Performance       ▪   Adequate control of pest plants within the works area.
          Criteria          ▪   No additional weeds are identified within the site at the end of construction.




                                                                                                  T
                            ▪   All construction plant adequately cleaned following completion of site works.




                                                                                       AF
                            ▪   Identification and eradication of fire ants.

          Control           ▪   All weed species are to be managed onsite prior to the commencement of clearing, earthworks and construction.




                                                                                 R
          Measures          ▪   Construction plant are to be certified weed free prior to arrival onsite.



                                                                           D
                            ▪   Construction equipment and machinery is to be adequately cleaned of dirt and weed propagules following completion of site work.
                            ▪   Any herbicides shall be used in accordance with manufacturer’s guidelines.

          Monitoring        Weekly inspections will be carried out to check:
                            ▪   All pest plant species have been adequately controlled.
                            ▪   No new pest plant species have been introduced to the site.
                            ▪   Appropriate certification is provided to demonstrate construction plant has been certified as weed free.

          Reporting         ▪   Reporting for invasive plants is completed as per Biosecurity Act 2014 requirements.




15 February 2024                                            Construction Environmental Management Plan                                                            16
                                                  79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.