Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
FPE Ref: 6693-240215-1.0
6.3 FAUNA MANAGEMENT
▪ Any injured or killed CEEVNT species are to be reported immediately (within 24 hours) to DES.
Incidents ▪ Fauna injuries / deaths occur.
▪ Fauna entrapment in construction area.
▪ Conservation significant species occurrence.
Corrective ▪ Re-educate personnel on importance of protecting fauna and mitigation measures required.
Actions ▪ Contact a suitably qualified ecologist to assist with rectification measures as required.
T
AF
R
D
15 February 2024 Construction Environmental Management Plan 15
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.