Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
 FPE Ref: 6693-240215-1.0



          6.6      AIR QUALITY & NOISE MANAGEMENT

          Objective          To minimise the impact of construction activity on the quality of air and potential noise pollution.

          Potential          ▪   Dust impact generated during excavation works.
          Impacts            ▪   Impact to surrounding site users from emissions of machinery.
                             ▪   Excessive noise generated by machinery during excavation works.

          Performance       ▪    No complaints in relation to dust emissions or other air quality impacts.
          Criteria          ▪    No noise complaints.




                                                                                                   T
                            ▪    No dust plumes visible from site boundaries.




                                                                                         AF
          Control           ▪    Advise neighbouring residents of proposed works at least 2 weeks prior to commencement.
          Measures          ▪    Construction activities are to be limited to the hours of 7:00am to 6:00pm Monday to Friday and Saturday 8.00am to 1.00pm. No noise




                                                                                  R
                                 generating works to occur on Sundays or public holidays.



                                                                             D
                            ▪    Control vehicle movements and speed (<10km/hr) to reduce the impact of dust.
                            ▪    All plant and equipment shall be fitted with an appropriate exhaust system in accordance with manufacturer’s specifications.
                            ▪    Ensure regular servicing of machines.
                            ▪    On-site burning of waste or vegetation is prohibited.
                            ▪    No engines are left idling unnecessarily.
                            ▪    Regular application of water to high dust areas as necessary.
                            ▪    Stabilise/cover stockpiles.

          Monitoring         ▪   Daily visual inspections for dust plumes leaving the site will be carried out by the Site Foreman.




15 February 2024                                             Construction Environmental Management Plan                                                                20
                                                   79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.