Skip to the record
For the highest quality transcripts.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
 FPE Ref: 6693-240215-1.0



          6.6      AIR QUALITY & NOISE MANAGEMENT
                             ▪   Quantitative dust monitoring is complaint driven unless requested by the administering authority.

          Reporting          ▪   Construction Foreman to maintain a log of relevant daily meteorological conditions, inspections and maintenance actions completed (including
                                 improvements).
                             ▪   The log is to be kept for verification of compliance on an as needs basis.
                             ▪   Maintain a register of air quality and noise related complaints, including a record of the time and nature of the alleged incident to aid in
                                 complaint verification.




                                                                                                T
          Incidents          ▪   Dust plumes visible outside the site boundary.




                                                                                        AF
                             ▪   Complaints of noise or dust received from neighbouring properties.

          Corrective         ▪   All complaints will be addressed by following the complaints procedure (Section1.9).




                                                                                  R
          Actions            ▪   Reinforce requirements and triggers for dust control.



                                                                          D
                             ▪   Limit periods of excessive noise as far as possible.




15 February 2024                                             Construction Environmental Management Plan                                                                         21
                                                   79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.