Original source · versioned page text
qldBUILT Construction Management Plan - JURA Rev02.pdf
FPE Ref: 6693-240215-1.0
6.7 WASTE & HAZARDOUS MATERIAL MANAGEMENT
Objective To minimise the environmental impacts of waste generated from construction works.
Potential Impacts Waste stored and disposed incorrectly has potential to negatively impact both human and environmental health.
Performance Criteria ▪ No rubbish/waste is visible over the site during works.
▪ The site or down gradient environment are not impacted by spills of hazardous contaminants over the site.
Control Measures ▪ All waste is either retrieved for reuse or disposed at an appropriately licensed waste treatment facility by licensed regulated waste
transporters.
T
▪ All wastes are to be protected from rain and stormwater contact.
AF
▪ Staff should be given clear instructions and be delegated responsibility for daily site waste/rubbish clean-up.
▪ Waste disposal bins should be provided on site, allowing for waste segregation where relevant – recyclable waste shall be segregated
R
and recycled where possible.
D
▪ All waste receptacles are to be sealed to avoid attraction of pest fauna.
▪ All food waste or scent laden items are to be secured in vehicles and/or disposed of in secured disposal units with fitting lids.
▪ No waste should be released into any waterway.
▪ All hazardous substances, dangerous goods and regulated wastes (including hydrocarbon compounds, pesticides, oil water emulsions,
batteries, sewage sludge) shall be stored, used and handled in accordance with relevant legislation, Australian Standards, safety data
sheets and codes of practice to minimise potential for spills on site.
▪ Washing out of paint and chemical products should be undertaken in areas designated for that purpose, no associated waste should
be released to the environment.
15 February 2024 Construction Environmental Management Plan 22
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (qldBUILT Construction Management Plan - JURA Rev02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.