Figure 3 – Treatment Plan
5.4.3.7 MUSIC Results
The resulting percentage-based load reductions at the outlet are shown in Table 4 below together
with the Water Quality Objectives for the receiving waters.
Residual
Sources % Reduction Target %
Load
Total Suspended Solids (kg/yr) 2450 437 82.1 80
Total Phosporous (kg/yr) 4.86 1.3 73.2 60
Total Nitrogen (kg/yr) 33.6 15.4 54.1 45
Gross Pollutants (kg/yr) 241 5.56 97.7 90
Table 4 – Percentage Based Load Reduction Results
5.4.3.8 POD Pollutant Reduction
5.4.3.8.1 Litter
Rubbish bins will be located within the building and car park for use by staff and visitors. The
carparks will be cleaned regularly. As a result of this and with the installation of the treatment
devices, levels of litter exiting the site via stormwater are expected to be negligible.
Excellence with Economy in Engineering 12
l:\8000-8999\8200-8299\8293\reports\26-07-22 stormwater management plan_issue e.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Revised Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.