26 July 2022 5.4.3.8.2 Sediment The TSS outflow is identified in Table 4 above. As can be seen from the above table the pollutant load reduction achieves the Water Quality Objectives. The TSS level is therefore considered acceptable. 5.4.3.8.3 Nitrogen and Phosphorous The TN and TP loads are identified in the above Table 4. As can be seen the TN and TP loads leaving the site achieve the Water Quality Objectives. The Nitrogen and Phosphorous residual loads are therefore considered acceptable. 5.4.3.8.4 Hydrocarbons Hydrocarbons will become trapped within the bioretention filter media. When there is a build-up of hydrocarbons within the bioretention basin, the top layer of the filter media can be removed and replaced ensuring that no hydrocarbons are discharged from the site. Studies have shown that micro-organisms in the organic mulch layer degrade and break down the petroleum-based hydrocarbons and hence they will not be discharged from site. 5.4.3.9 Surfactants Washing of cars is not expected on site for the proposed development, as a result surfactants should not be an issue for the drainage system. 5.4.3.9.1 Heavy Metals Heavy metals in stormwater runoff generally become attached to fine sediment. The bioretention basin will remove the majority of this fine sediment. The removal of the fine sediment should effectively remove most of the heavy metals in the runoff. 5.4.3.9.2 Pathogens/Faecal Coliforms Domestic animals within the development will be under the control of their owners at all times and the owners will be expected to clean up after them. 5.5 Proposed Stormwater Quality Treatment Devices 5.5.1 Locations The location of the proposed stormwater quality treatment device is shown on MPN Plan 8293- CP.1.01 attached in Appendix 3. 5.5.2 Device and Size The device type and size are depicted on MPN Plan 8293-CP.1.01 attached in Appendix 3. 5.5.3 Operation The bioretention basin operates by filtering runoff through densely planted surface vegetation, then percolating the water through a sandy loam filter media with details as per MPN Plan 8293- CP.2.01 attached in Appendix 3. As the water is percolated through the soil, pollutants are captured by fine filtration, adsorption and biological uptake. Excellence with Economy in Engineering 13 l:\8000-8999\8200-8299\8293\reports\26-07-22 stormwater management plan_issue e.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Revised Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.