Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Storm Water - Lex Toth

Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.

Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

OVERFLOW PIPE TO GULLY PIT

EXTENDED DETENTION DN32

OUTLET TO GULLY PIT

Co

 

ROOFWATER DOWNPIPE

 

 

eli

 

sot”

FIRST FLUSH DIVERSION

ia TO GARDEN BEDS

 

 

 

 

 

 

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers

8/41 Sunshine Beach Road

P.O. Box 2305
{ NOOSA HEADS 4567
Ph: 54749081

= www.callaghanandtoth.com.au

project

PROPOSED DUPLEX

location

10 OPAL LANE,
COOROY

TYPICAL RAINWATER TANK

Figure 4.1

 

 

Scale:NTS

 

 
Log in to download the original file

Storm Water - Lex Toth.pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.