Original source · versioned page text
Storm Water - Lex Toth
Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.
Attached to the e-mail MCU19/0013 & RAL19/0003 - Response to Information Request - 10 Opal St Cooroy.
Callaghan & Toth 4. STORMWATER DESIGN AND ASSESSMENT 4.1 Proposed On-Site Stormwater Treatment Process The developed site was divided into Sub-Catchments as shown on Figure 1.1 and the detention system is listed below: 1. Rainwater Detention Tanks will be required to collect water from all the roof areas of the new house. A total of two (2) tanks with a capacity of 3,000 litres per tank will be provided for the new house. The tanks are to an overflow pipe discharging to the underground drainage system. The total tanks capacity is to be 6,000 litres and is adequate for the approximate attenuation of runoff back to predevelopment concentrations for AEP1%, 10%, 50%. 4.1.1 Rainfall Data The meteorological data used for the BOM IFD table for Cooroy was used for the runoff calculations 4.2 HYDROLOGY The site has been modelled using HydroCAD 10 to determine the detention capabilities of the rainwater tanks. The rainwater detention tanks adopted have been sized so that runoff concentrations are reduced back to predevelopment levels as shown in our calculations in Appendix 1. As the existing runoff and catchment extents to Opal Street is not to be affected by this development, there will be no change to the capacity of drainage to Opal St.. As the new runoff from the new house in Opal Lane is to be attenuated to pre-development levels, there will be no change to the capacity of existing drainage in Opal Lane. Erthart 1905 SWMP_Rev0.doc April 2019 8 1905
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.