Original source · versioned page text
2019-02-18 General Committee Agenda
The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 FEBRUARY 2019
Criteria Planning Scheme Original Current Proposal Complies
Proposal
Landscaped open space 1329m² min 1513m² 1513m²
Soft landscaping 797.4m2 min 60% of 1296m² 1296m²
Landscaping Setbacks total
Building height
storeys 2 storeys max 1 storey 1 storey
metres 8 metres 5.25 metres 5.25 metres
Boundary setbacks
Frontage 6 metres min
Kauri Street 6 metres 6 metres
Olivine Street 5 metres 5 metres X
Side 2.6 metres min 4 metres 4 metres
Length of wall 15 metres max 21.1 metres 14 metres
(units 9 and 10) (decrease in wall
length)
Roof pitch 12 degrees 10 degrees 12 degrees
(increase)
Eaves 600mm eaves to Complies Complies
75% of the
perimeter of the
building
Carparking 25 covered min 21 covered 19 covered
6 uncovered min 8 uncovered 9 uncovered
Yield
As shown below in Table 1, the total number of units has not changed, only the configuration.
Presented at Planning & Environment Meeting Proposed
13 x 2 bedroom 15 x 2 bedroom
4 x 3 bedroom 2 x 3 bedroom
17 units 17 units
Table 1 – Development yield
All units remain less than 90m² providing housing diversity for Cooroy in accordance with
Council’s Housing Needs Assessment (Briggs and Mortar March 2017) undertaken for the new
Noosa Plan.
Setbacks
The setbacks to Kauri Street are the same as previously proposed to Olivine Street and raise no
concern as the development is low rise, with the only encroachment for veranda posts and good
opportunities for landscaping.
Built form
Variation has been provided to break up the roof form seen from Kauri Street and an increase to
the roof pitch from 10 degrees to 12 degrees to complement the Cooroy character. The applicant
has provided articulation to the units of concern and the proposal plans are now considered to
address all outstanding built form matters raised by officers previously.
Page 12 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.