Original source · versioned page text
2019-02-18 General Committee Agenda
The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 FEBRUARY 2019 REPORTS DIRECT TO GENERAL COMMITTEE 6 FURTHER REPORT - MCU18/0166 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING TYPE 4 CONVENTIONAL (17 DWELLING UNITS) AT 25 KAURI STREET, COOROY DOCUMENT INFORM AT ION Author Development Planner, Glen Conforti Environment and Sustainable Development Department Index ECM / Application / MCU18/0165 Attachments 1. Proposal plans EXECUTIVE SUMMARY Not applicable. RECOMMENDATION That Council note the report by the Development Planner to the Planning & Environment Committee Meeting dated 12 February 2019 and the further report to the General Committee Meeting dated 18 February 2019 regarding Application No. MCU18/0165 for a Development Permit for Material Change of Use - Multiple Housing - Type 4 Conventional (17 dwelling units) situated at 25 Kauri Street, Cooroy and: A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date DA01 18 Site Calculations & Staging Plan, prepared by All 05-02-2019 Design and Drafting DA02 18 Site Plan, prepared by All Design and Drafting 05-02-2019 DA03 18 Site Plan – Landscaping and Fencing, prepared by 05-02-2019 All Design and Drafting DA04 18 Site Elevations, prepared by All Design and Drafting 05-02-2019 DA05 18 Site Elevations, prepared by All Design and Drafting 05-02-2019 DA06 18 Unit Type T1A, prepared by All Design and Drafting 05-02-2019 DA08 18 Unit Type T1B, prepared by All Design and Drafting 05-02-2019 DA09 18 Unit Type T2, prepared by All Design and Drafting 05-02-2019 DA10 18 Unit Type T3, prepared by All Design and Drafting 05-02-2019 DA11 18 Exterior Materials and Colours, prepared by All 05-02-2019 Design and Drafting Page 3 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.