GENERAL COMMITTEE MEETING AGENDA 18 FEBRUARY 2019
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $35,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
4. The requirements of this development approval are to be effected, prior to the use of
the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.
Building Height
5. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
6. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the buildings do not exceed the maximum height requirement of this Decision
Notice.
Building Appearance
7. A mix of materials and colours must be incorporated into the external building finishes
reflective of Cooroy’s traditional character and the schedule detailed on All Design
and Drafting plan DA11 and dated 5 February 2019.
8. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining
properties.
Fencing and Walls
9. Fencing must be generally in accordance with the approved plans and setback an
average of 1 metre from the front property boundary and articulated by stepping the
design at maximum 5 metre intervals. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
10. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Clothes Drying Areas
11. Each dwelling unit must be provided with access to an outdoor clothes line which is
screened from public view.
Community Management Statement
12. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
13. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice.
Page 4 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.