Original source · versioned page text
2021-03-15 General Committee Agenda
The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 MARCH 2021
REPORT
1. PROPOSAL
The application proposes to develop an over 50’s seniors living facility in the form of 246
dwelling units and associated communal facilities in five stages on land which is within the
Rural Zone and Open Space Recreation Zone. The applicant has applied for this use as a
Multiple Housing Type 3 Retirement and Special Needs (Seniors Living Community).
The application also proposes to construct a new club house, associated car park and a
buggy/cart store for the Cooroy Golf Club situated on land within the Open Space Recreation
zone. The club house will be in a different position to the existing club house and will result
in modification and relocation of several holes. A Material Change of Use application for
Entertainment & Dining Type 2 (Recreation amusement fitness) has been made for this new
cub house.
A sales showroom for the seniors living facility is proposed adjacent to the Myall Street front
boundary and is to be accessed off the proposed new driveway/internal road. A three
bedroom manager’s unit is also proposed at the eastern end of this new internal road.
The dwelling units comprise 3 different design options, each with 3 roof form options. The
dwelling options and associated bedrooms/bathroom/car parking details are as follows:
The communal facilities are to include a club house, summer house, residence workshop,
tennis court, bocce green, swimming pool, recreational open space areas, visitor parking
areas and an RV compound parking area.
It is proposed that the development be undertaken in stages generally as follows:
• Stage 1 – Main entry road, sales showroom, managers residence, club house and
resort recreational facilities, bocce green and 46 dwelling sites;
• Stage 2 – 51 dwelling sites and emergency access to Myall Street / Nandroya Street
• Stage 3 – 41 dwelling sites;
• Stage 4 – 46 dwelling sites;
• Stage 5 – 62 dwelling sites, and manager’s workshop and summer house.
With regards to the delivery of works to the golf course including the construction of the new
golf club house and facilities, the applicant has advised that the works will be delivered in
conjunction with Stage 1 of the GemLife development via an Infrastructure Agreement. To
also secure the delivery of the works GemLife have proposed a bond 1.07 times the value of
the works ($9,375,000). Financial contributions are also proposed to be made to the Cooroy
Golf Course Club.
Access and egress to the seniors living community and new golf club house is proposed from
Myall Street, approximately 260 metres north of the existing roundabout, and the internal
road network would be privately owned. An emergency access point is proposed
approximately 90 metres north of the roundabout. A total of 32 visitor parking spaces are
proposed for the seniors living community and each dwelling contains a double garage.
Page 19 of 80
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.