Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2021-03-15 General Committee Agenda

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                       15 MARCH 2021




 Figure 20: Proposed works within the Riparian Buffer – 2006 (yellow) and 2020 (purple) planning schemes

    Traffic and Car Parking:
    The application was reviewed by both the Department of Transport and Main Roads (DTMR),
    as a referral authority, and by a consulting traffic engineer. DTMR have advised the access
    to the site from the north-western corner and associated left and right turning lanes in Myall
    Street is acceptable. DTMR’s required access point results in significant works in the riparian
    buffer attributed to the access driveway and bridge. DTMR have confirmed that an alternative
    access is available at the southern end of the site and outside the riparian buffer.
    The review of the proposal by the external traffic engineer notes that in terms of the impacts
    on the broader road system:
           … the impacts are mainly on TMR roads and intersections and TMR have issued their
           approval. Furthermore, the additional information supplied in the TTM report of 28 Nov
           2019 is sufficient to verify that the traffic generation rates they used in the original TTM
           report of 9 September 2019, are appropriate. In that context, given that the golf club
           already exists (acknowledging that the new clubhouse will be bigger), it is reasonable
           to assume that most of the golf course traffic is already on the road system and will
           simply access the road system at a new location further along Myall Street. Thus, the
           additional traffic is essentially that associated with the retirement community, which
           being in the order of 25 in and 25 out in the AM peak, would be less than 5% of existing
           peak hour volumes in Myall Street (about 500vph in each direction in the AM peak)
           after allowance is made for some site traffic to be oriented to/from the Bruce Highway,
           rather than all being associated with the Cooroy township direction.
           … if the relocatable home park were to operate in the future without age restriction,
           then the associated traffic generation of the relocatable home park would be expected
           to be 2-3 times greater than that associated with a retirement use (2-3 times higher


                                                                                          Page 46 of 80
Log in to download the original file

2021-03-15 General Committee Agenda(PDF, 11MB).pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.