Skip to the record
Every meeting, every word.

Original source · versioned page text

2021-03-15 General Committee Agenda

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


   Stormwater:
   The applicant’s proposed water quality and water quantity outcomes have been reviewed by
   an external consultant who advises the applicant has addressed the significant issues in
   regard to stormwater quantity/quality and any outstanding issue could be addressed by the
   inclusion of reasonable conditions. Notably, the stormwater bio- basin for the senior living
   facility is proposed on the golf course land and would require an easement to be created
   over these to allow maintenance of these into the future.
   Sewer connection:
   Documentation provided by the applicant includes a Decision Notice from Unitywater which
   authorises and is limited to connection of network infrastructure and property services
   infrastructure at Lots 2 & 3 SP115864 to Unitywater’s network infrastructure, and where
   relevant, the establishment of water supply and sewerage network works infrastructure,
   subject to conditions. The approval requires works to be in accordance with a Water Supply
   and Sewerage Network Capacity Assessment prepared by the applicant which states the
   proposed development will be serviced by a private pump station and rising main that is
   planned for connection to the SPS CRY012 catchment, via a gravity main crossing across
   Myall Street. The rising main alignment will be located within the subject site and allotments
   to north, parallel to the western property boundaries.
   The proposed location of the private pump station and rising main are detailed in the following
   image:




                       Figure 21: Location of pump station and rising main

                                                                                   Page 48 of 80
Log in to download the original file

2021-03-15 General Committee Agenda(PDF, 11MB).pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.