Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2021-03-15 General Committee Agenda

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                15 MARCH 2021


   5.    CONSULTATION
   5.1. Referral Agencies
   The application was referred to the following Referral Agencies:
   •     Department of Infrastructure, Local Government and Planning (SARA)
   The Department is a referral agency for:
   •     Schedule 10, Part 9, Division 4, Subdivision 1, Table 1, Item 1 (Planning Regulation
         2017)
         Development application for material change of use stated in schedule 20 of the
         Planning Regulation 2017
   •     Schedule 10, Part 9, Division 4, Subdivision 2, Table 1, Item 1 (Planning Regulation
         2017)
         Development application for reconfiguring a lot within 25m of a state controlled road
   •     Schedule 10, Part 9, Division 4, Subdivision 2, Table 4, Item 1 (Planning Regulation
         2017)
         Development application for a material change of use within 25m of a state-controlled
         road and railway
         The Department response included conditions relating to:
   •     Setback of the development from the railway corridor to be generally consistent with
         the SARA approved pan;
   •     The development being carried out in accordance with supporting flood study and
         storm water management report to ensure that the state-controlled road is not
         impacted;
   •     Provision of new bus stops on Myall Street;
   •     Provision of internal pedestrian pathway connecting to Myall Street, a pedestrian
         crossing at the front of the site and pedestrian footpaths to the new bus stops;
   •     Roadworks in Myall Street including left and right turning lanes and road widening;
   •     Vehicular access to the state-controlled road (Myall Street);
   •     Emergency access;
   •     Provision of a noise barrier to address vehicular noise from Myall Street
   The following image is an excerpt from the approved set of SARA plans and provides
   details of works to the frontage of the site, a copy of this plan is included in Attachment 6




                          Figure 23: SARA approved plan – Myall Street



                                                                                   Page 51 of 80
Log in to download the original file

2021-03-15 General Committee Agenda(PDF, 11MB).pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.