Council archive · source document
Attachment 2A - Emergency Management Plan Noosa - Final · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
FM – 6.3.5 Emergency Management Plan template
Stage 2 – Flooding Standby (12-24 hours) - continued
Maintenance Manager / Maintenance Team Member
Check the following tasks have been commenced:
• Storm water pumps are operational and without fault
• The sandbags have been deployed around the lift shafts and the Basement
storerooms
• The backup pump is available
Ensure all outdoor furniture and equipment is stored or properly secured, including pool
furniture, Buggies, Machinery, Equipment and Materials.
Turn off pool filtration equipment on all pools.
Check and test all emergency backup equipment such as generators and pumps.
Ensure all lifts are locked off in a high position and power isolated.
Predetermine an adequate warning time for a ‘Crash Shut Down’ and ensure the
equipment requiring shut down is clearly indicated.
Resort Operations Controller / Food & Beverage Manager
Ensure that the undercover terrace is closed and all outdoor furniture, including pool
lounges, properly stored and secured.
Make arrangements for proper storage of food should there be a loss of power and
refrigeration.
Ensure adequate food and water supplies are made available to provide to guests and
staff.
Ensure cooking facilities are available should there be a loss of power.
Communications Officer / Accommodation Manager
Ensure that regular flood warning updates are received and communicated to all key
emergency personnel, staff and guests.
Ensure all inbound guests / tour companies are contacted and advised of the impending
flood conditions and the possibility of transport being affected.
Inform the guests that the swimming pool will be closed and for their safety to remain
indoors.
Assist in the reassurance of guests as to their welfare and safety.
Provide the Disaster Controller with a full guest listing.
Ensure all front office, reservations and accounts information has been backed up.
Request all guests to report any leaks and damages to units
Department Head or Supervisor
Obtain department rosters to identify what staff are onsite and when.
Contact staff to advise if assistance is required or to remain at home due to the weather
conditions.
Assist with organising accommodation requirements for staff who may be required to
remain onsite during the emergency situation.
Document Title: Issue: 6 Next review date:
FM – 6.3.5 Emergency Management Plan Review date: February 2026 June 2026
Noosa Resort
Document Owner: Authorised by: Page: 56 of 77
Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2A - Emergency Management Plan Noosa - Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.