   FM – 6.3.5 Emergency Management Plan template

   FLOOD CHECKLIST
   The following Checklist can be utilised to assist with ensuring and managing all steps within the
   emergency response plan have been addressed and or completed.

   Stage 1 – Continual Heavy Rainfall
         Maintenance Manager / Maintenance Team Member -
         Check and clear all storm water drainage inlets
        Check storm water pumps are operational and without faults.
         Check all equipment including backups are available and ready
         Check and monitor the water levels in all Lagoon areas.
         Accommodation Manager/ Front Office Supervisor
         Broadcast updates to staff and Disaster Controller.
         Identify items in the Basement Car Park that will need to be moved should the need arise.
         Contact owners of vehicles parked in the Basement car park – request movement of
         vehicles if deemed necessary
    
         Establish Emergency Incident Log
         Contact inbound guests / tour companies to inform them of the impending weather
         conditions and the possibility of flights and transport being affected.
         Identify any special needs guests and their requirements should a situation arise.
         Prepare for critical systems and data to be backed up as required.


   Stage 2 – Flooding Standby (12-24 hours)
         Disaster Controller
         Convene an Emergency Meeting of the Department Heads to discuss the possibility of
         flooding affecting the resort and implement Flooding Emergency Response Plan.
         Ensure the Disaster Command Centre has been established and manned.
         Commence the flooding checklist and ensure key emergency personnel are prepared for
         commencing any required tasks.
         Prepare an Emergency Incident Report Log ready for when the emergency situation is
    
         declared.
         Obtain a two-way radio and establish contact with Maintenance on Channel 4.
         Ensure a pre-determined “Crash Shut Down” time has been identified in order to safely
         shut down all utilities if required
         Evacuate persons to First floor areas should it be required.
         All Key Emergency Personnel have commenced their tasks under the emergency
         response plan




Document Title:                           Issue: 6                                 Next review date:
FM – 6.3.5 Emergency Management Plan      Review date: February 2026               June 2026
Noosa Resort
Document Owner:                           Authorised by:                           Page: 55 of 77
Health Safety & Wellbeing                 Manager HSW

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2A - Emergency Management Plan Noosa - Final.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.