Skip to the record
Every meeting, every word.

Original source · versioned page text

SWMP Technical Memo Climate Change as submitted with Further Advice response

of 6
                                                                                   ENGINEERING & PROJECT SERVICES
                                                                                            Sunshine Coast | Brisbane
                                                                                    www.recor.au | ABN 89 647 469 707



Figure 1 - DRAINS climate-adjusted 1% AEP model results (Full Unsteady hydraulic model)




The upper model branch reports the pre-development discharge of 0.151 m3/s. The middle branch reports
0.197 m3/s unmitigated. The lower detained branch reports two controlled outlet components of 0.088
and 0.060 m3/s, combining to 0.148 m3/s, with zero overflow.




P0478-26-001 | Cooroy Social Housing | RFI Item 4    Page 4 of 6

Log in to download the original (SWMP Technical Memo Climate Change as submitted with Further Advice response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.