6. Storage verification
Figure 2 - Main OSD tank storage-elevation relationship




Figure 3 - Critical 1% AEP + 20% storage hydrograph: 25-minute burst, Storm 4




The storage-elevation curve provides approximately 75 m3 at RL 118.00 m. The critical hydrograph peaks at
approximately 74 m3, corresponding with the modelled peak level of RL 117.98 m. The storage
subsequently draws down through the adopted dual outlet controls.




P0478-26-001 | Cooroy Social Housing | RFI Item 4     Page 5 of 6

Log in to download the original (SWMP Technical Memo Climate Change as submitted with Further Advice response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.