2208-30528 SRA - Response with conditions - RAL22 0017
Attached to the e-mail RAL22/0017 - SARA Referral agency response – with conditions..
2208-30528 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Development permit – Reconfiguring a lot (1 into 2 lots)
Schedule 10, Part 9, Division 4, Subdivision 2, Table 1 - The chief executive administering the
Planning Act 2016 nominates the Director-General of Department of Transport and Main Roads to be
the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
Stormwater management
1. (a) Stormwater management of the development must ensure (a) and (b) At all times
no worsening or actionable nuisance to the state-controlled
road.
(b) Any works on the land must not:
(i) create any new discharge points for stormwater
runoff onto the state-controlled road;
(ii) interfere with and/or cause damage to the existing
stormwater drainage on the state-controlled road;
(iii) surcharge any existing culvert or drain on the state-
controlled road;
(iv) reduce the quality of stormwater discharge onto the
state-controlled road.
Vehicular access to state-controlled road
2. (a) The road access locations, are to be located generally in (a) At all times
accordance with the Subdivision Proposal Plan, prepared by
Eagle Surveys, dated 24-5-2022, reference 3976 ROL and (b) and (c) Prior to the
revision A.
commencement of use
(b) Road access works comprising a vehicle crossing –
residential driveway (at the road access location) must be
provided generally in accordance with the Subdivision
Proposal Plan, prepared by Eagle Surveys, dated 24-5-2022,
reference 3976 ROL and revision A.
(c) The road access works must be designed and constructed in
accordance with:
(i) Institute of Public Works Engineering Australasia
Standard Drawings RS-049, Rev C and RS-050,
Rev G; and
(ii) Department of Transport and Main Roads' Road
Planning Design Manual 2nd Edition.
State Assessment and Referral Agency Page 3 of 7