2208-30528 SRA - Response with conditions - RAL22 0017

Attached to the e-mail RAL22/0017 - SARA Referral agency response – with conditions..

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                    2208-30528 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Development permit – Reconfiguring a lot (1 into 2 lots)
 Schedule 10, Part 9, Division 4, Subdivision 2, Table 1 - The chief executive administering the
 Planning Act 2016 nominates the Director-General of Department of Transport and Main Roads to be
 the enforcement authority for the development to which this development approval relates for the
 administration and enforcement of any matter relating to the following condition(s):
 Stormwater management
 1.           (a) Stormwater management of the development must ensure                  (a) and (b) At all times
                  no worsening or actionable nuisance to the state-controlled
                  road.

              (b) Any works on the land must not:
                  (i)    create any new discharge points for stormwater
                         runoff onto the state-controlled road;
                  (ii)   interfere with and/or cause damage to the existing
                         stormwater drainage on the state-controlled road;
                  (iii)  surcharge any existing culvert or drain on the state-
                         controlled road;
                  (iv)   reduce the quality of stormwater discharge onto the
                         state-controlled road.
 Vehicular access to state-controlled road
 2.           (a) The road access locations, are to be located generally in             (a) At all times
                  accordance with the Subdivision Proposal Plan, prepared by
                  Eagle Surveys, dated 24-5-2022, reference 3976 ROL and                (b) and (c) Prior to the
                  revision A.
                                                                                        commencement of use
              (b) Road access works comprising a vehicle crossing –
                  residential driveway (at the road access location) must be
                  provided generally in accordance with the Subdivision
                  Proposal Plan, prepared by Eagle Surveys, dated 24-5-2022,
                  reference 3976 ROL and revision A.

              (c) The road access works must be designed and constructed in
                  accordance with:
                  (i)     Institute of Public Works Engineering Australasia
                          Standard Drawings RS-049, Rev C and RS-050,
                          Rev G; and
                  (ii)    Department of Transport and Main Roads' Road
                          Planning Design Manual 2nd Edition.




 State Assessment and Referral Agency                                                                      Page 3 of 7
Log in to download the original file

2208-30528 SRA - Response with conditions - RAL22 0017.pdf · 307 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.