                                                                                              2208-30528 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
        the State Development Assessment Provisions (SDAP) v3.0. If a word remains undefined it has
        its ordinary meaning.

Further development permits required
2.      Road works approval: Under section 33 of the Transport Infrastructure Act 1994, written
        approval is required from the Department of Transport and Main Roads to carry out road works
        on a state-controlled road. Please contact the Department of Transport and Main Roads’ on
        [email protected] with the completed application form and supporting
        information to make an application for road works approval. This approval must be obtained
        prior to commencing any works on the state-controlled road reserve. The approval process
        may require the approval of engineering designs of the proposed works, certified by a
        Registered Professional Engineer of Queensland (RPEQ). Please contact the Department of
        Transport and Main Roads’ as soon as possible to ensure that gaining approval does not delay
        construction. Further information on applying for road works approval is available here:
        https://www.tmr.qld.gov.au/Community-and-environment/Planning-and-development/Other-
        matters-requiring-approval#roadworks
3.      Public utility works and connection approval: The applicant is advised that if any works
        and/or connections are required to public utility services within a State-controlled road corridor,
        approval must be given by the Department of Transport and Main Roads under the relevant
        public utility legislation (electricity, water/sewer, telecommunication), and in accordance with
        TMR technical standards (TN163). Approvals must be obtained prior to commencing any utility
        works within the state-controlled road corridor. Please contact the public utility team via
        [email protected] for further information on the application and approval process.




State Assessment and Referral Agency                                                              Page 4 of 7
Log in to download the original file

2208-30528 SRA - Response with conditions - RAL22 0017.pdf · 307 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.