12. OBoat Hire - Noosa Plan Codes
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes
Pedestrian and cycling connectivity
and conservation zone within a
radius of 500 metres of the site.
PO36 AO36 Complies:
Development promotes safe and Pedestrian and bicycle pathways
efficient walking and cycling by are provided and retained or a The existing operation already
providing sealed pathways along contribution towards pedestrian has connectivity with pathways
easily understood direct routes and bicycle pathways are made along the foreshore.
with opportunity for casual in accordance with the Council's
surveillance. infrastructure network planning
Editor’s Note— specific pathway
design requirements are included
in PSP6 Engineering design
standards
Performance outcomes Acceptable Outcomes
Earthworks and drainage
PO37 AO37 Complies
Filling, excavation and retaining
Filling and excavation works are
structures do not directly, designed and constructed to The proposed structure will
indirectly or cumulatively causeensure overland flow and/or involve only minimal and short-
adverse impacts external to the flooding is not worsened, lived disturbance to the riverbed
development site by: impeded, or otherwise diverted during the removal of the old
to adversely affect other piles and installation of the new
properties or downstream piles. Should a sediment plume
(a) causing ponding of water on environments. occur as a result of the piling
the site or nearby land; activities and spread to greater
than 30m from the source, work
(b) increasing flooding, which
is to stop and action is taken to
adversely affects the safety or
reduce the plume from
use of any land upstream and
spreading. This may be to
downstream; or adversely
either wait for the turning tide
affecting the flow of water in
or engage silt curtains to limit
any overland flow path.
the spread of the plume.
The major structure
components will be made off-
site and delivered as finished
components. They will be
brought to site and joined
together on site ensuring only
minor “construction” works are
carried out on site.