12. OBoat Hire - Noosa Plan Codes
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes
Environment and heritage
PO38 AO38.1 Complies
Development: Development does not result in
sediment or other material
(a) has minimal impact on the including building materials or
natural landform of the site; waste products being deposited A silt curtain will be placed
(b) does not lead to erosion or or released into the road reserve, around the site prior to any
stormwater drain or adjacent works commencing. This is
the transport of
sediments off site; properties. noted in the redevelopment
AO38.2 plans. This will contain any
(c) does not lead to the Development on a site adjoining sediment or other waste
disturbance of natural a local heritage place respects products being released to the
features, buildings or the cultural heritage significance waterway.
structures of cultural heritage of the place by mitigating any
significance. adverse impacts on the setting or The proposed structure will
integrity of the heritage values. involve only minimal and short
lived disturbance to the bed
Editor’s Note: Local heritage during the removal of the old
places are identified on piles and installation of the new
the Heritage and Character Area
piles. Should a sediment plume
Overlay Maps in schedule 2.
occur as a result of the piling
activities and spread to greater
than 30m from the source, work
is to stop and action is taken to
reduce the plume from
spreading. This may be to wait
for the turning tide.
The major structure components
will be made off-site and
delivered as finished
components. They will be
brought to site and joined
together on site ensuring only
minor “construction” works are
carried out on site.
PO39 Complies:
Uses are conducted in an No acceptable outcome provided
environmentally responsible The existing commercial use
manner, operating without currently operates in a manner
deleterious impacts on suitable to and considerate of
immediate, surrounding or the marine environment.
downstream communities, Methodologies for the proposed
environments or environmental redevelopment will be
processes. consistent with the existing use.
PO40 AO40 Not applicable:
Development does not adversely Buildings and other structures