Original source · versioned page text
14006 - Application for Operational Works Carpark
Attached to the e-mail Operational Works Application OPW18/0293.
“Adamson Town Planning, specialising in providing higher order town planning advice”
Erosion and Sedimentation Control
The proposed design will ensure construction activities are managed to prevent erosion and
sedimentation to offsite waters. The proposed development facilities erosion control, drainage
control and sediment capture and treatment, consistent with the overall outcomes and
purpose of the code.
Summary
The proposed operational works provides detailed design for carparking, access and
stormwater drainage and treatment, consistent with the conditions of the development
approval. Landscaping plans for the are to be submitted as soon as possible consistent with
the Landscaping Code.
The proposed operational works is generally consistent with the approved plans under the
development approval for the Noosa Medical and Professional Centre. Further it is intended
to construct the carparking as soon as possible.
Should you require further information please contact me.
Yours faithfully
Shane Adamson (BEngTech, GDURP, MPIA, MQELA)
Town Planning Specialist
Director - Adamson Town Planning Pty Ltd
4|Page
16004 – Noosaville Medical and Professional Centre Pty Ltd, October 2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original