Original source · versioned page text
Minor Change Existing Approval 132008 478 02 {As Published}
DG-500- C PVC Barrel Vault Double Basketball 10.03.2021
001.12 Courts Electrical Plan, prepared by
Greenline
2. This approval is for the fifth stage of the school which includes an extension to the
multipurpose hall and a lecture theatre and shall not exceed 74 staff on site at any one time
and a maximum of 740 students in total for stages 1, 2, 3, 4 and 5.
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
4. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscaped plan. Such landscaping is
to be completed prior to the premises being occupied and maintained at all times thereafter.
5. Any persons attending the school for an evening function shall be encouraged to park in the
southern car park to minimise disturbance to residents in Alyxia Court.
6. Any fencing provided in conjunction with the development is to be setback an average of 2
metres to any road frontage, apart from pipe rail and powder coated chain wire, which may
be erected on the property boundary. Dense landscaping shall be provided to a minimum
width of 2 metres between the fence and the buildings/car park area.
7. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use. The landscape
plans referred to above are to denote areas of existing vegetation or existing trees proposed
to be retained.
8. Any advertising sign or device is to comply with the provisions of Council’s policies on
advertising.
9. The buildings shall not exceed a maximum building height of 8 metres and 2 storeys except
for the multipurpose hall which must not exceed 10 metres measured in accordance with the
Planning Scheme.
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted, to secure performance of all conditions of this approval, prior to a Development
Permit for Operational Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit.
11. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Land Development
12. The applicant shall undertake works in accordance with the approved Management Plans for
the site including the Environmental Management Plan and Stormwater Quality Management
and Assessment Report prepared by Callaghan & Toth. If the approved management plans
do not incorporate the works proposed for Stage 4 amended management plans shall be
submitted with inclusion of issues for Stage 4 for approval prior to submission of Operational
Works application.
13. The Developer shall continue monitoring water quality in the gully for a period of 3 years from
completion of the final stage of construction.
Page 4 of 13
Document Set ID: 21473277
Version: 5, Version Date: 18/05/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.