               14.    For a year in which the rainfall is the median of wetter than average years or the median of
                      dryer than average years for the locality, the operator of the School shall demonstrate via a
                      mass water balance approach that the effective hydrologic cycle (i.e. the annual amounts of
                      surface water runoff and groundwater recharge) of the catchments of the significant gully on
                      the site will not change by more than 10% from their present condition, taking into
                      consideration the volumes of water harvested in rainwater tanks and reused for in-house
                      purposes, that is captured and infiltrated via water sensitive urban design measures and also
                      the external water imported to the site via the piped potable supply.
               15.    The Developer is to install water quality control devices generally in accordance with the
                      Stormwater Management Plan. Detailed staging plans and specifications, based on and
                      generally in accordance with the Plan are to be prepared and submitted (after consultation
                      with officers of the Council) with the relevant applications for operational works.
               16.    The Developer is to complete the drainage works progressively in conjunction with
                      development of the site and generally in accordance with the approved Stormwater
                      Management Plan. Detailed drainage plans and specifications, based on and generally in
                      accordance with the approved Drainage Plan, the EMP and these Conditions, are to be
                      prepared and submitted (after consultation with officers of the Council) with the relevant
                      applications for operational works.
               17.    All drainage works as required by the Drainage Plan are to be provided by the developer at
                      its own cost.
               Vehicle Access
               18.    Vehicular access to the carparking for Stage 5 of the development shall be via the existing
                      access driveways constructed as part of the previous stages 1-4.
               Car Parking
               19.    Carparking shall be provided within the site generally as shown on drawing Master Plan &
                      Site Plan SD-01 ‘St Teresa’s Catholic College Stage 5’ dated February 2008 and prepared
                      by Onedegree, except as modified herein.
               20.    A minimum of 148 uncovered carpark spaces shall be provided in total.
               21.    The new carparking area and driveway shall be designed to comply with the provisions of
                      AS/NZS 2890.1-2004 for user class 3 with allowance for vehicles to enter and leave the site
                      in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m.
               22.    The car park and aisles will be constructed with an asphaltic concrete seal that complies with
                      Council standards. No gravel-surfaced areas are permitted. The car park will also include
                      stormwater treatment measures in accordance with the approved Stormwater Management
                      Report.
               23.    All carparking shall be kept, maintained and line-marked in a condition fit for use.
               24.    All staff carpark spaces shall be clearly defined by line marking each space with the words
                      “Staff Parking Only” and by sign posting each space with a similar wording.
               Vegetation Protection & Preservation
               25.    During construction, all vegetation being retained shall be fenced during construction to
                      ensure trees are not damaged.
               26.    All underground services, drainage, footpaths, bikepaths, roads and other site works shall
                      be located to minimize adverse impacts on retained vegetation, particularly their root
                      systems. This will also require the location of the site office and the materials storage area
                      to be agreed with by Council’s Construction Technical Officer Development.




                                                                                                       Page 5 of 13
Document Set ID: 21473277
Version: 5, Version Date: 18/05/2021
Log in to download the original file

Minor Change Existing Approval 132008 478 02 {As Published}.pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.