Minor Change Existing Approval 132008 478 02 {As Published}

of 13

Page text shows just the words. Original shows the document exactly as it was published.

               27.    Vehicular pavements within the drip zone of any of the existing trees on site to be retained
                      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
                      allow water that falls on this surface to penetrate to the trees root system. The pavement
                      shall be constructed so as not to damage the tree or their root system and in this regard
                      temporary fencing shall be provided around the trees during construction to help protect
                      them.
                      Plans shall be submitted to the Council for approval that clearly show the type and extent of
                      the pervious pavement and the temporary fencing prior to obtaining a Development Permit
                      for Operational Works.
               28.    Prior to entering the site, all construction machinery and vehicles shall be washed down to
                      remove soil that may contain weed seeds, soil pathogens and pest species.
               Roof Water & Stormwater Drainage
               29.    All stormwater drainage shall be collected on site and discharged so there is no net increase
                      in stormwater runoff from the site. Stormwater drainage will be in accordance with the
                      approved Stormwater Management Plan.
               30.    To ensure that polluted runoff does not enter Council’s stormwater drainage system,
                      stormwater runoff from car parking areas and the driveways must be in accordance with the
                      Integrated Water Management Plan, prepared by Callaghan & Toth dated February 2020,
                      the planning scheme and in compliance with the relevant and applicable standards and
                      guidelines.
               31.    All site stormwater drainage shall be by means of a gravity system.
               32.    A minimum flor level freeboard of 0.3m shall be provided for buildings and storage areas
                      above the top water level of the stormwater overland flows.
               33.    An easement for drainage in favour of Council for any external drainage systems that need
                      to discharge onto the site shall be created over the full length and width of major storm event
                      surface flow paths within the site at no cost to Council. A dealing number for registration of
                      the easement shall be obtained from the Land Titles Office before occupation of the site.
               Sewer Mains & Town Water Supply
               34.    The site shall be connected to Council’s existing sewerage reticulation systems at no cost to
                      Council.
               35.    Detailed design drawings and calculations shall be submitted with an application for a
                      Development Permit for Plumbing Works in respect of water or sewer works. To avoid conflict
                      with other underground pipes or services, all existing and proposed services required by the
                      development shall be shown on the plans.
               36.    The alignment of the sewers will need to consider significant vegetation and where possible
                      avoid interfering with its root systems. This may require changes to the alignment shown and
                      more manholes.
               37.    The site shall be connected to Council’s existing town water supply at no cost to Council.
               38.    Fire hydrants are to be provided throughout the development generally in accordance with
                      Council and Queensland Fire Service standards. Any requirements of the “Fire Management
                      Plan St Teresa Catholic School” by Rob Friend & Associates Pty Ltd dated October 2003
                      shall also be implemented. Service conduits shall be provided to ensure a connection is
                      available.
               Earthworks
               39.    Fill imported to the site may only be from a site licensed with The Environmental Protection
                      Agency or from a site for which a Development Permit for Operational Works has been issued
                      approving the export of fill.




                                                                                                       Page 6 of 13
Document Set ID: 21473277
Version: 5, Version Date: 18/05/2021
Log in to download the original file

Minor Change Existing Approval 132008 478 02 {As Published}.pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.