Minor Change Existing Approval 132008 478 02 {As Published}
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $2,397
PSP16 – Sewerage Headworks Contributions $47,575
PSP17 – Water Supply Headworks Contributions $50,536
PSP20 – Pathway Trunk Network Contributions $2,422
TOTAL Contribution Amount = $102,930
Please note, that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from March 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee
in full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
47. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
shall be submitted in conjunction with an application for a Development Permit for
Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout is to be submitted in conjunction with any application for Operational Works.
48. Digital detailed designs including drawings, calculations, specifications etc, shall be
submitted with any application for a Development Permit for Operational Works in respect of
roadworks and stormwater drainage works. The design shall be in accordance with Council’s
Planning Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and
Earthworks. To avoid conflict with underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.
49. To facilitate production of As Constructed drawings it is suggested that all design drawings
are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
the use of ADAC are available at www.adac.com.au).
50. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
51. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
52. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Environmental Health
53. Where any food premises is included in a development, the following is required:
Page 8 of 13
Document Set ID: 21473277
Version: 5, Version Date: 18/05/2021