                      53.1. Plans and application is to be made to Council’s Environmental Health Section for
                            approval prior to any building approval, fitting out or use of the premises.
                      53.2. A statement indicating the purpose of the food premises, type of food sold, proposed
                            menu and maximum number of patrons at any time, is to accompany the application
                            for plan approval.
                      53.3. Construction and use of the food premises should comply with Council’s Food
                            Premises Policy and the Food Safety Standards. (Both available from Council)
                      53.4. Toilets for customers and staff to be provided in accordance with Building Code of
                            Australia. Obtain advice from a building certifier on numbers and standards, including
                            disable access.
                      53.5. Plans and approval is required for any mechanical exhaust ventilation system, which
                            should comply with AS1668. A certificate from the installer certifying the system
                            complies with the Standard must be obtained and lodged with Council prior to
                            commencement of trade.
                      53.6. Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must
                            obtain a Food License from Council, prior to use of those premises.
               54.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
                      paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or be
                      placed where it could reasonably be expected to move into a roadside gutter, storm water
                      drain or a watercourse. On the spot fines apply for such offences.
               ENGINEERING CONDITIONS - 20 APRIL 2020
                      Bioretention Basin - Construction
               55.    Stormwater management system, recycling and water quality treatment system must be
                      upgraded and provided generally in accordance with the submitted document titled
                      Integrated Water Management Plan, prepared by Callaghan & Toth, Ref No:1923 IWMP.doc
                      Rev 0, dated 17 Feb 2020; and in compliance with the relevant and applicable standards and
                      guidelines.
               56.    The refurbished biobasin and associated structures, batters, drainage pipe works and
                      maintenance access must be upgraded in accordance with the document Construction and
                      Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design,
                      2009) and in compliance with an engineering design and details prepared and certified by
                      suitably qualified RPEQ. A copy of the certified engineering design must be provided for
                      Council records.
               57.    During construction and establishment of the biobasin device, the supervising RPEQ must
                      ensure that the device is constructed in accordance with the document Construction and
                      Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design,
                      2009) and that the forms contained in section 3.15 including the associated supporting
                      information and data are completed. These forms and certification from the RPEQ that the
                      device has been constructed in accordance with the Construction and Establishment
                      Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), and the
                      certified engineering drawings of the completed works must be submitted to Council prior to
                      the issue of the final Building Certification.
               58.    A construction hold point with the supervising RPEQ must be established once the
                      bioretention device underdrainage pipe work is installed. At the time of inspection, a sample
                      of the drainage layer, transition layer, and filtration media materials must be stockpiled on-
                      site. Laboratory results must be provided for the filter media which demonstrate that the
                      media complies with the specifications contained in the latest version of the “Guidelines for
                      Soil Filter Media in Bioretention Systems” (produced by the Facility for Advancing Water
                      Biofiltration) and that the minimum hydraulic conductivity specified on the certified
                      engineering plans will be achieved. In addition, laboratory results must be provided
                      demonstrating that the transition layer and drainage layer meet the following bridging criteria:


                                                                                                       Page 9 of 13
Document Set ID: 21473277
Version: 5, Version Date: 18/05/2021
Log in to download the original file

Minor Change Existing Approval 132008 478 02 {As Published}.pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.