2103-21744 SRA - Response with conditions · OPW21/0049
Attached to the e-mail OPW21/0049 - SRA application correspondence - Referral agency response – with conditions.
2103-21744 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Operational work
The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. (a) The construction, operation or maintenance of the approved (a)
development must not damage or interfere (physically or by At all times
electrical or electro-magnetic emissions) with any aid to
navigation. (b)
As indicated
(b) In the event that damage or interference is caused to any aid to
navigation, the Harbour Master must be immediately contacted
on (07) 3305 1700 and at the applicant's cost the damage or
interference must be promptly repaired, replaced or interference
removed.
2. (a) Provide written notice to the Regional Harbour Master (Brisbane) (a)
– (address below), when the development authorised under this At least 20 business
approval is scheduled to commence. days prior to the
commencement of
(b) Provide written notice to the Regional Harbour Master (Brisbane) works
– (address below), when the development authorised under this
approval has been completed.
Each notice must state this application number, the location and (b)
name of registered place and the condition number under which Within 20 business
the notice is being given and provided to days of the completion
[email protected] or mail to: of works
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
3. (a) Provide a Marine Execution Plan (MEP), prepared by an (a) and (b)
appropriately qualified person(s), to the Regional Harbour Master At least 20 business
(Brisbane) at [email protected] or mailed to: days prior to the
Maritime Operations Base commencement of
MacArthur Avenue East works
Pinkenba QLD 4008
(c)
(b) The MEP must ensure the safe management of marine works For the duration of
and should include: works
i. forecasted start and end dates
ii. hours of work
iii. methodology overview
iv. contractor details of principal barges and marine
State Assessment and Referral Agency Page 4 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2103-21744 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 339 KB (small file)
- File type
No other editions are linked here.