2103-21744 SRA - Response with conditions · OPW21/0049
Attached to the e-mail OPW21/0049 - SRA application correspondence - Referral agency response – with conditions.
2103-21744 SRA
equipment involved
v. a Barge Mooring Plan
vi. extreme weather contingency plans
vii. contact details for 24/7 communication during extreme
weather events and emergencies
viii. a Vessel Traffic Management Plan
ix. marking of navigation hazards.
(c) Undertake the works in accordance with the MEP.
4. (a) Prepare a hydrographic survey (conducted to C class) of the Within 20 business
authorised dredging channel days of completion of
the works
(b) Provide a copy of the hydrographic survey to Regional Harbour
Master (Brisbane) at
[email protected] or mailed to:
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
5. (a) All vessels, structures, plant and equipment associated with the For the duration of
works must not impede the safe navigation of other ships or works
restrict safe access to or from neighbouring structures, including
access across Noosa Bar.
(b) All vessels, structures, plant and equipment associated with the
works must be lit/marked in accordance with the following
specifications:
i. dredging plant to include symbology indicating safe side to
pass
ii. all barges are to be lit at night, including flashing yellow
lights, characteristics Fl.Y.4s on all corners
iii. any floating pipeline is to be marked by poles with retro-
reflective tape for daytime and flashing yellow lights,
Fl.Y.4s, at regular intervals
iv. any submerged pipeline us to be marked by yellow special
marks indicating obstruction on the seabed
v. any barge anchors deployed must be marked with yellow
buoys and fitted with flashing yellow lights, characteristics
Fl.Y.4s
vi. temporary marker buoys may need to be laid to mark
extremities of work.
(c) Lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.
The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Environment and Science to be the enforcement authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to the
following conditions:
6. The dredging and beach nourishment must be undertaken generally For the duration of the
in accordance with the following plans: works
i. General Arrangement, prepared by BMT, dated 26/05/2021,
State Assessment and Referral Agency Page 5 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2103-21744 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 339 KB (small file)
- File type
No other editions are linked here.