Skip to the record
Accept no substitutions.

Council archive · source document

Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 17

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                      - Paints and solvents          that location was a place that could lawfully
                        including the cleaning       be used as a waste facility for that waste.
                        of equipment, tools
                        and brushes.                 Submit to the Principal’s Representative
                      - Cleaning materials and       reports, including the record of waste
                        rags                         disposal and method and location of
                      - Trade Waste                  disposal; and immediate reports of the
                      - Materials unsuitable         details of any waste from the site which has
                        for re-use; and              been conveyed or deposited at any place
                      - Other waste                  that cannot lawfully be used as a waste
                                                     facility for that waste.



Records               Sufficient records to          This EMP and modifications to suit this          Site Manager       Continual        3.4.5 EMS
                      demonstrate appropriate        Contract will be submitted to Principal’s
                      environmental                  Representative
                      management.
                                                     The EMP will be updated as required.
                      Notifications and Fines
                      from the EPA and the           Appropriate progress and other reports will
                      resulting Corrective           be submitted to the Principal’s
                      Action                         Representative
                                                     The Principal’s Representative will be
                                                     notified of all EPA action and Fines from the
                                                     EPA and the resulting Corrective Action
                                                     All records will be securely filed using an
                                                     effective document retrieval system.

Vehicle Access        Damage to the                  All vehicles and plant will access the site      Site Manager       Site Specific    Site Specific
                      ecosystems on Site is          along designated routes                                             Induction        Induction Records
                      minimised                                                                       Contractors        Training
                                                                                                                                          Traffic Flow Plan

Parking of            Damage to the                  All vehicles and plant will park in              Site Manager       Site Specific    Site Specific
vehicles and          ecosystems on site is          designated areas                                                    Induction        Induction Records
plant                 minimised                                                                       Contractors        Training
                                                                                                                                          Traffic Flow Plan



Movements of          Damage to the                  All pedestrian materials and equipment           Site Manager       Site Specific    Site Specific
pedestrians,          ecosystems on site is          movement from and to vehicles will be                               Induction        Induction Records
materials and         minimised                      along approved access routes                     Contractors        Training
equipment                                                                                                                                 Traffic Flow Plan



Wash down of          Storm water is not             Vehicles and plant will be washed down           Site Manager       Site Specific    Induction Records
vehicles and          polluted by residues from      only in areas approved by the Principal’s                           Induction
plant                 wash down                      Representative for this purpose                  Contractors        Training         Site Specific
                                                                                                                                          Induction
                                                                                                                                          Traffic Flow Plan

Reinstatement         Re-instatement of              Relevant areas of Site will be cleaned and       Site Manager       Immediately      2. Risk Register EMP
                      damaged eco-systems to         re-instated
                      their previous conditions                                                       Landscaping
                                                                                                      Contractor




               Document ID: WC ENV 002          Revision: 011       Date: 20/02/2024             Owner: HSEQT Manager
                          Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                                        Environmental Management Plan / Page 10 of 18

Used in these records

About this file

File size
427 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 427 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.