Objectives and Responsibilities
OTHER
When RECORDS
Actions required to achieve Responsible
Issue Objective actions will
Objective Person Records
be taken
location
Vehicles and Exhaust emissions are No vehicles or plant producing excessive Site Manager Immediately Mobile Plant
plant minimised exhaust emissions will be used. Checklists,
Task Observations
Emergencies All environmental All environmental incidents will be Site Manager Immediately 3.4.7 EMS
Incident incidents are reported to reported to the Principal’s Representative
Reporting the Regional HSE Advisor immediately.
Emergencies Spills are contained, Emergency procedures to handle spills Site Manager Immediately 2. Risk Register EMP
Spills damage to the eco- including oil and chemicals will be
system minimised and established before delivery begins.
rectification organised.
Other Damage to the eco- Emergency procedures to handle other Site Manager Immediately 3.4.7 EMS
environmental system from foreseeable environmental emergencies
emergencies environmental will be established.
emergencies is minimised.
Compliance Compliance with Rectify any environmental breaches Site Manager Rectified as Audit Reports
Audit environmental identified within the time frame specified in soon as
requirements and, if the audit. possible after
breaches are detected, notification
rectification of defects.
Noise Minimal detrimental Adherence to EPA, Council and other noise Site Manager Continual 2. Risk Register EMP
impact limits will be mandatory. Monitoring
Equipment will be kept in good repair and
condition.
Woollam will contact, co-operate and
coordinate with neighbouring facility
operators.
Waste Quantity Where possible minimize If possible, development and Contractor to do Ongoing Daily Site Reports
of materials quantity of waste implementation of a strategy to reduce the this work in
materials generated quantity of waste generated as a accordance with
consequence of the Contract EPA
requirements
and in
conjunction with
Woollam
Waste Disposal Appropriate and lawful Identify lawful places for disposal of all Civil Contractor As required 2. Risk Register EMP
disposal of waste types of waste generated as a consequence contracted to do
associated with the of the Contract. this work in Waste Reports
Contract including: accordance with
Ensure that no waste from the site is EPA
- Packaging materials’ conveyed to or deposited at any place that requirements
- Replaced or redundant cannot lawfully be used as a waste facility
parts or materials for that waste.
- Chemicals
- Oils and grease from Record, for all waste, the method and
machinery location of disposal, and whether or not
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 9 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 427 KB (small file)
- File type
No other editions are linked here.