Original source · versioned page text
Meeting papers
PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT 8 APRIL 2025
b. Planting the disturbed areas with a species mix and density reflective of the local
variation of the Regional Ecosystem and site specific conditions. These works must
be undertaken by a qualified person* and be to the reasonable satisfaction of the
Manager Development Assessment.
*(Refer to Advisory Note)
Page 7 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.