Council archive · source document
Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published) · MCU23/0007
Page 16 of 22 Document Set ID: 25255015 Version: 5, Version Date: 22/10/2026 [OCR of page images] Attachment 1—Referral agency conditions (Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development approval relating to this application) (Copies of the documents referenced below are found at Attachment 5) 2605-52275 SRA No. | Conditions Condition timing Material change of use 10.9.4.2.4.1 — Material change of use of premises near a state transport corridor —The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Transport and Mian Roads to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. (a) Noise attenuation measures to achieve the following noise criteria must be provided: (i) Balconies on the upper level of the east and south (Myall Street) facing elevations as shown on Site Elevations, prepared by Push, dated 16 April 2026, drawing number 2000, issue B must include balustrades that are solid, gap- free and continuous for their complete length other than gaps required for drainage purposes in accordance with the Building Code of Australia. (ii) Fencing provided along the eastern and southern boundary adjacent the State-controlled road is to be solid gap-free fence, or other solid gap free structure (b) Noise attenuation measure must be a continuous solid gap-free structure, constructed of glass, concrete blocks, bricks or fibre cement sheeting, or balustrade, other than gaps required for Grainage purposes in accordance with the Building Code of Australia. Prior to the commencement of use and to be maintained at all times. (a) Close and remove the existing vehicular property access located between 18C5605 and Myall Street. (b) The road works to close and remove access, referred to in part (a) of this condition, must be in accordance with the Department of Transport and Main Roads’ Road Planning and Design Manual, 2nd Edition. The road works must: (i) remove the driveway crossover and any drainage structure/s beneath the driveway; (ii) reinstate the kerb and channel; (iil) reinstate road pavement after closure and removal; (iv) establish a pedestrian pathway; and (v) reinstate the table drain and/or grass footpath between the pavement edge and the property boundary. Prior to the commencement of use. Direct access is not permitted between Myall Street and the subject site. At all times (a) Stormwater management of the development must not cause worsening to the operating performance of the state transport corridor mode, such that any works on the land must not: i. create any new discharge points for stormwater runoff onto the state transport corridor mode ji. concentrate or increase the velocity of flows to state transport corridor mode (a) At all times. (b) Prior to obtaining development approval for operational work. State Assessment and Referral Agency Document Set ID: 25255015 Version: 5, Version Date: 22/10/2026 Page 3 of 7 Page 16 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.