Council archive · source document
Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published) · MCU23/0007
Page 17 of 22 Document Set ID: 25255015 Version: 5, Version Date: 22/10/2026 [OCR of page images] 2605-52275 SRA iti. interfere with and/or cause damage to the existing (c) Within 20 business stormwater drainage on the state transport corridor mode days of the iv. surcharge any existing culvert or drain on the state completion of transport corridor mode works. v. reduce the quality of stormwater discharge onto the state transport corridor mode vi. impede or interfere with any overland flow or hydraulic conveyance from the state transport corridor mode vii. reduce the floodplain immunity of the state transport corridor mode (b) Submit RPEQ certification with supporting documentation to [email protected] within the Department of Transport and Main Roads, confirming that the development has been designed in accordance with part (a) of this condition. (c) Submit RPEQ certification with supporting documentation to [email protected] within the Department of Transport and Main Roads, confirming that the development has been constructed in accordance with parts (a) and (b) of this State Assessment and Referral Agency Page 4 of 7 Page 17 of 22 Document Set ID: 25255015 Version: 5, Version Date: 22/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.