2003/221132
Roads
82. All roads shall be constructed generally in accordance with the layout indicated on Plan of
Development prepared by PMM, Drawing Number 4740-56b dated 21 June 2004 and the
conditions contained in this approval.
83. The road to the east that will connect to Swanbourne Way ultimately shall have a 20 metre
wide road reserve between the entry road and Lot 6 on RP 80412 and can reduce to 16 metre
wide road reserve along the eastern frontage of proposed lots 124 and 125. This road shall
have an 11 metre wide pavement (kerb to kerb) for its full length.
84. All new roads will be required to comply with Council requirements for carriage widths. The
road design may not be strictly in accordance with Council’s Engineering Standards but this is
because of the required incorporation of swales, vegetation retention and pedestrian/bikeway
paths and will be to the satisfaction of Council.
85. The access to the new school shall be in accordance with the approved drawings in
Development Permit 23468 DA. This roundabout will also service the contemporary parcels
on the east of the development. Council may consider a separate egress point from the
school site if Australian Standards requirements for sight distance and a traffic loads analysis
indicates that roundabout 4 on Eraland Consulting Pty Ltd Drawing No. 01691-100 dated April
2003 have enough capacity to cater for the increase in traffic generated by this modification.
86. The developer will also be required to undertake the necessary modifications to the existing
school’s access and car parking in accordance with Eraland Consulting Pty Ltd Drawing Nos.
01691-1 Amdt D, 01691-2 Amdt E and 01691-3 Amdt D Dated July 2003. The developer will
have to construct the new road on an alignment that allows the school access to be
constructed in accordance with this plan and will also construct the modified car park and
access at the existing school. Discussion is to be held with Queensland Education about
programming of construction.
87. Access to each lot shall be constructed to the standards and requirements of the Council.
88. The following frontage works shall be constructed across all road frontages within the site:-
88.1. Construction of new kerb;
88.2. Vehicular access to each lot;
88.3. Associated stormwater drainage, generally in accordance with WBM’s Report of 2/10/02
and as subsequently modified in their letter to Council of 14/11/02.;
88.4. New stormwater management to correct the current problem of stormwater discharge
from the road reserve to the Noosa Primary School;
88.5. Hot mix correction to existing pavement as required;
88.6. Concrete bikeways/footpaths. The Developer is advised to contact Council to obtain the
footpath alignment.
88.7. The remaining footpath area shall be formed, topsoiled and turfed, and planted with
trees.
A Development Permit for Operational Works shall be obtained prior to undertaking these
works.
89. Alterations to lot sizes, number of lots and layout may be required following the issue of a
Development Permit for Operational Works in respect of the internal roadworks design.
90. The developer will construct industrial strength crossovers to two parcels at the end of the
proposed cul-de-sacs to enable the largest service vehicle to do a three point turn and leave
the street in a forward direction. This will be included in an operational works application.
Page 16 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.