Council archive · source document
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published] · 132003.221132.7
Plans and drawings: the text below has words only, no drawings.
2003/221132
Bikeways/Pedestrian Paths
91. The developer will construct a path along the Beckmans Road frontage of existing Lot 7. The
Beckmans Road and new road bikeways should be constructed generally as indicated on
Eppell Olsen & Partners Drawing No 3866-003 Issue A dated October 2002. The bikeway on
the Beckmans Road frontage may need to be aligned within the open space area but any
alignment would require vegetation retention.
92. The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lots 109 -
110 to the northern constructed end of Swanbourne Way in the form of a path and timber
bridge 2 metres wide.
93. Internally (that is the area of the development north of Plan 3866-003) the bikeway network
should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03 with the exception of
bikes being allowed in the open space area except the Swanbourne Way crossing. The
pedestrian paths indicated in the open space on the plan will need to have their alignment and
need agreed to in the Open Space Management Plan.
94. The developer will also construct a bikeway within the site along the road that allows
connection to the new road linkage, through the parcel to the east, to Swanbourne Way
required by this permit.
95. The developer will also be required to pay contributions towards the construction of the
bikeway link to the Lake Entrance Boulevard Network. The amount of the contribution shall be
calculated at the rate current at the date of payment, subject to CPI changes.
An estimate only of the contributions payable for each Stage is as follows:-
Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003
Stage
A B1 B2 B3 C D
Current at December March March March March December
CPI 2004 2010 2010 2010 2010 2004
Bikeway $ 21,944 $ 5,338 $ 6,524 $ 10,083 $ 17,200 $ 1,247
Contributions shall be paid prior to Council endorsement of the Plan of Survey for each Stage
of the reconfiguration.
With regard to Stage D, the future development of the Forest Cluster Precinct will attract
further contributions that will be assessed at the time of the future applications.
Sewer
96. The sewer network shall be generally in accordance with the approved ‘Sewerage Reticulation
Master Plan’ - Drawing 01691-130B by Eraland Consulting.
97. Design for a sewerage system to connect all new lots within the site to Council's existing
sewerage reticulation system shall be to the standards and requirements set out in Council’s
Engineering Design Standards. If the design requires the construction of a pump station and a
rising main, the connection point to Council's existing system will be nominated by the
Manager - Land Development.
98. Detailed design drawings and calculations shall be submitted with an application for a
Development Permit for Operational Works in respect of water or sewer works. To avoid
conflict with other underground pipes or services, all existing and proposed services required
by the development shall be shown on the plans.
99. All connections to sewer system shall be carried out either by Council or by a Council
approved Contractor and at no cost to Council. Any connection to a water main shall be
undertaken by Council.
Page 17 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.