Council archive · source document
06/0823 - Applicant's Response to Information Request including Attachments [As Published] · 132006.823
Very large file (42.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
60. 60. 61, 61. 62. 62. 63. 63. In relation to the site's hydrology, the already constructed Stages 1 and 2 and proposed development were modelled using the RAFTS-XP hydrologic package. The results of this modelling indicate that the peak flows from the site (for a range of critical storms ranging from a 1 year through to a 100yr event) do not increase the peak flows at the main site outlet. The reason for this is that despite there being an increase in the total flows from the catchment, the flows from the developed portions of the catchment are discharged faster than flows that come from the upslope areas (e.g. the National Park). As such the larger flow volume is better distributed and does not result in a lumping effect which would have seen increases in the peak flow rates. The revised report Viridian Noosa Hydrology and Stormwater Management Plan can be provided to Council Officers upon request. Please provide a plan showing locations of rainwater tanks for each dwelling unit. Schedule 8 of The Noosa Plan shows the site as being located in a Rainwater Tank Area and as such needs to comply with the requirements of this schedule. The amended plans detail the provision of 3000 litre rainwater tanks for all Villa accommodation units. The tanks are proposed to be located within the building undercroft areas, and will be supported by the Villa structure. It is noted that these tanks will be plumbed into service the surrounding landscaping and toilets of each Villa. Please provide site details as to how stormwater outlets will be designed to ensure flows are not concentrated and will not cause erosion. Stormwater outlets will be designed similar to the existing construction outlets using both pipe work, gabions or ‘rip rap’ basins to prevent scouring. Plans detailing these stormwater outlets are included in Attachment 20. It is proposed to review each outlet on site with Council and amend construction techniques to suit individual outlet issues that may arise. As detailed in Item 57 of this Response, The applicant’s on-site representative will hold a weekly review meeting with Council Officers, and will then instruct the Head Contractor to the reviewed design (ie. if any changes are required). Please provide details on the Stormwater Treatment Train proposed for the site when in operation. The revised treatment train is shown in Figure 2-1 of the updated report, titled Viridian Noosa Hydrology and Stormwater Management Plan. This revised report can be provided upon request. Council requires all basement carparks to be gravity drained. Please provide details of the drainage plan for the site. It is acknowledged that all basement carparks are to be gravity drained. Detailed drainage plans will be submitted as part of the Operational Works application to Council. Stormwater outlets are shown on plans included in Attachment 20. These plans show the drainage outlet levels, drainage line levels and lowest building floor levels. All outlet levels are well below the level of adjacent building basements. Ail buildings will be connected to the proposed new drainage systems except Building | (N). The basement of Building | (N) will be connected to the existing drainage system that runs to the north. Invert level of the existing drain is RL 24.71 and the basement level is RL 27.00. Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.