Council archive · source document
06/0823 - Applicant's Response to Information Request including Attachments [As Published] · 132006.823
Very large file (42.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
59. 59. Reference is made to the Bayview Noosa Hydrology and Stormwater Management Plan prepared by WBM Oceanics Australia and that the strategies contained in this report, regarding water quality and quantity of the runoff leaving the site, will still be adopted for the proposed development. There is concem that the percentage of impervious area on the site has been increased since the CAS and it is requested that this be investigated to ensure the proposed strategies are sufficient to handle any increases in quantity of runoff and any deterioration in quality of runoff. in this regard, please submit a copy of the Bayview Noosa Hydrology and Stormwater Management Plan prepared by WBM Oceanics Australia for this application with any relevant amendments to ensure the current proposal will have no detrimental impacts from the quantity or quality of runoff leaving the site. The previously prepared report, titled Bayview Noosa Hydrology and Stormwater Management Plan, has been entirely revised to ensure that it specific to the proposed development. In relation to water quality, there have been some changes in the proposed stormwater treatment train for the site. The revised treatment train is shown in Figure 2-1 of the updated report, titled Viridian Noosa Hydrology and Stormwater Management Plan. The current proposed stormwater treatment train is described below: « Upslope runoff (i.e. above the gabion walls) will be either diverted around the development, or captured and piped under the development directly to the creek, where it will be released via appropriately designed outlets (includes energy dissipation devices); + All areas external to the site have been extensively revegetated, the revegetation works will be monitored and managed to ensure the program is successful; + Within the site, rainwater tanks will be attached to the Resort Villas, water from the tanks will be reused for toilet flushing and landscaping; + Roof drainage (not going to the tank) and tank overflows will be piped directly to the ephemeral creek; : There will be some use of swales on site; and + The majority of road and open space areas within the resort will be captured in a piped stormwater system and treated via gross pollutant traps prior to discharge to the ephemeral creek. Pollutant export from the site was assessed using MUSIC Version 3. The results of the pollutant export modelling indicate that pollutant loads exported from the site (including the already constructed Stages 1 and 2 and the current proposal) do not worsen when going from the undeveloped site scenario to the fully developed site scenario. This was the result demonstrated in the previous, Bayview Noosa Hydrology and Stormwater Management Plan prepared in 2003. These results are however, reliant on the success of the revegetation strategies in the undeveloped portions of the site. Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.