3.4 PRE-DEVELOPMENT SITE XP-STORM
A peak flow analysis has been undertaken using the XP-STORM version 2021.3 for sizing the detention
tank. The pre-development site was modelled using a single node and peak flows verified against the
Rational Method Calculation.
3.4.1 CATCHMENT DATA
Table 3 presents the catchment modelled in XP-STORM. Refer to Drawings No. M3024E_DA1_SK01 in
Appendix D for the catchment plan.
Table 3 – Pre-Development Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
E1 0.0486 57% 10%
3.4.2 RAINFALL DATA
The site specific 2016 rainfall intensities obtained from BOM coupled Australian Rainfall & Runoff (AR&R)
1987 temporal patterns for zone 3 have been used to generate peak flow hydrographs in XP-STORM.
3.4.3 HYDROLOGICAL LOSSES
The following initial loss, continuous loss and Manning’s n values have been adopted for the
hydrological modelling. They are within the ranges recommended in the AR&R (1987) for Southeast
Queensland.
Table 4 – Hydrological Losses
Continuing Loss
AEP Area Type Initial Loss (mm) Manning’s n
(mm/hr)
Impervious Area 0 0 0.014
63% to 1%
Pervious Area 15 2 0.07
3.4.4 BX FACTOR
A Bx factor of 1.8 has been used across all AEPs modelled.
3.4.5 EXISTING PEAK DISCHARGE
The XP-STORM hydrology was run for the standard AEPs from a 63% AEP to a 1% AEP and 15 to 180-
minute standard durations. Table 5 presents pre-development site peak flows.
Table 5 – Pre-Development Peak Flows
Pre-Development Peak Flows (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Rational Calc 0.010 0.013 0.018 0.022 0.026 0.033 0.037
XP-STORM 0.012 0.017 0.021 0.027 0.032 0.034 0.038
Variance +0.002 +0.004 +0.003 +0.005 +0.006 +0.001 +0.001
The XP-STORM peak flows are generally similar to the Rational Method Calculation, particularly for the
larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow rates have been used for the
peak flow and detention tank analysis for this site.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.