Original source · versioned page text
Reference Documents - MCU23 0070
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
DISCLAIMER This report has been prepared for the purpose and exclusive use of Cambooya Pty Ltd as an investigation into the stormwater management issues related for the proposed development of the land described in the report. The information presented in this report is not to be used for any other purpose or by any other person or corporation. JFP Urban Consultants Pty Ltd accepts no responsibility for any loss or damage suffered howsoever arising to any person or corporation who may use or rely on this report without further input and/or advice from JFP Urban Consultants Pty Ltd. The investigations, calculations, analysis and recommendations presented in this report rely on information sourced from third-parties. JFP Urban Consultants Pty Ltd accepts no responsibility for the accuracy of the information sourced from third-parties. SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH P a g e | 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.