Original source · versioned page text
Reference Documents - MCU23 0070
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
RATIONAL METHOD CALCULATION – EXTERNAL
CATCHMENT (DOUGLAS LANE)
EXTERNAL
Catchment Details
CATCHMENT
Area (ha) 0.1302
Impervious Area (ha) 0.1042
Fraction Impervious (%) 80%
1
I60 (mm/hr) 75.2
C1 0.70
C2 0.74
C5 0.83
C10 0.87
C20 0.91
C50 1.00
C100 1.00
Time of Concentration (min)
Catchment Method Tc
EXTERNAL CATCHMENT Standard inlet time, mostly paved/impervious areas 6
Rainfall Intensities (mm/hr)
Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
EXTERNAL CATCHMENT 120 151 184 215 245 284 313
Stormwater Quantities (m3/s)
Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
EXTERNAL CATCHMENT 0.030 0.040 0.055 0.068 0.081 0.103 0.113
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.