Original source · versioned page text
Reference Documents - MCU23 0070
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
MANNING’S CALCULATION – DOUGLAS LANE
Cross Sec tion Details 1 % AEP Flow
P oint CH Z n wA wP n x wA
1 0.00 0.080 0.015
2 0.00 0.000 0.015 0.00 0.04 0.00
3 0.50 0.012 0.015 0.02 0.50 0.00
4 1.31 0.027 0.015 0.02 0.80 0.00
5 2.06 0.021 0.015 0.01 0.75 0.00
6 2.61 0.018 0.015 0.01 0.56 0.00
7 2.88 0.017 0.015 0.01 0.26 0.00
8 3.50 0.073 0.015 0.00 0.29 0.00
9 4.67 0.089 0.015
wA wP n x wA
TO TAL 0.073 3.207 0.001
Slope (m/m)
0.08 R n Q
0.023 0.015 0.113
Design Flow (m³/s) 0.113
WSL (m) 0.042
Results
Channel Flow (m³/s) 0.113
Velocity (m/s) 1.54
Max. Depth (m) 0.042
DV Product (m²/s) 0.07
0.10
0.09
0.08
0.07
0.06
0.05 Surface
1% AEP Flow
0.04
0.03
0.02
0.01
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Chainage (m)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.