NOOSA COUNCIL IDAS Development Application Decision Notice                                                    3 of 6




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
       approved plan of Development. The approved plans are titled Serenity Close Streetscape Improvement
       Strategy and numbered SK/01 and SK/02 prepared by CBD Settlers Cove and dated DEC. 2007 and may
       be amended by these conditions.

2.     All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
       be visible at all times to ensure prompt access in case of emergency.

3.     The landscape construction is to be implemented in accordance with the approved landscape plan,
       planting schedule and horticultural industry best practices.

4.     The existing street trees (Peltophorum pterocarpum) indicated in the approved plans are to be retained.

5.     Prior to the commencement of construction, all trees nominated for retention on the approved landscape
       plans shall be cordoned off with protective barricade fencing to prevent impact from stock piling of soils or
       materials, parked cars and machinery.

6.     All trees are to be planted a minimum of 1 metre from all underground services.

7.     All boulders are to be securely placed to avoid any movement.

8.     Mounding is to have a finished level that is equal to or less than the mounding height that currently exists
       on site.

9.     The type of construction material to be used for the ‘path crossover’ shown in drawing number SK/02 is
       required to be submitted to the Manager of Land Use and approved by Council, prior to works
       commencing.

10.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways.

11.    Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
       notice of intention to commence works to arrange a “pre-start” meeting regarding the landscaping works.

12.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the landscaping works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.

       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       landscaping works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.
       All rectification works are to be completed within 10 business days of the completion of construction works
       or, alternatively, the Applicant may request that Council carry out the rectification work at the Applicant’s
       cost, such cost being paid by the Applicant to the Council within 10 business days of the completion of
       construction works.
       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid within 10 business days of the completion of construction works.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]

Used in these records

About this file

File size
26 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000056.001 [As Published].pdf · 26 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.