Council archive · source document
Decision Notice - 010.2008.00000056.001 [As Published] · 142008.56
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 6
13. Prior to acceptance of landscaping works "On Maintenance", the lodgement of satisfactory “As
Constructed” records shall be submitted to Council. Transparent copies of the design plans showing “As
Constructed” details are required for Council’s records. Such copies will be required prior to works being
accepted “On Maintenance”, where applicable. Requirements for “As Constructed” information are
detailed in Council’s Engineering Design Standards Manual.
14. The Applicant is required to maintain the works until they are accepted “Off Maintenance”, which will be 3
years after Council accepts the works “On Maintenance”.
15. These works are also to be in compliance with any relevant conditions or management plans approved
with Development Permit No. 23118DA.
16. This Development Permit lapses if the development has not happened by 6 February 2010, unless
application to extend the currency is approved by Council.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000056.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 26 KB (small file)
- File type
No other editions are linked here.