Earthworks Code – The Noosa Plan
Performance Criteria and Acceptable Solutions
Performance outcomes Acceptable outcomes Assessment
Drainage S1.1 RO1 Bulk earthworks will be designed to prevent
O1 The finished surface gradient of any filled or ponding on the site or on neighbouring land.
excavated area is within the range 0.5% to
Finished surface levels ensure land is free draining.
1.5% and drains to Council’s stormwater
infrastructure where available or where
stormwater infrastructure is not available,
toward the street.
Hydraulics No solution provided. RO2 The existing drainage characteristics of the site
O2 and surrounding area has been considered. The
proposal ensures that surrounding properties
Any change to the level of the land does not have an and downstream stormwater infrastructure and
adverse flooding impact on the flooding and drainage waterways are not adversely impacted by the
characteristics off-site. proposed development.
Geotechnical considerations For assessable development— RO3 All filling will be undertaken in accordance with
O3 S3.1 Filling works are undertaken in Council’s PSP5 – Engineering Design
Standards – Roads and Drainage & Earthworks
Earthworks do not result in geotechnical instability on accordance with Section 2.8- Filling of Site of
Council’s PSP5 - Engineering Design and AS 3798 - Guidelines for earthworks on
the premises or nearby premises.
Standards- Roads and Drainage & Earthworks commercial & residential development. All
excavation will be undertaken with no adverse
AND
impact on neighbouring properties or
S3.2 W here the filling is for residential surrounding infrastructure.
commercial or industrial purposes the works
comply with Sections 3 to 6 of AS 3798 -
Guidelines for earthworks on commercial &
residential development.
Local amenity S4.1 The following control measures are RO4 Water trucks shall be used to minimise dust
O4 implemented— emissions. An ESC plan is to be prepared for
Earthworks do not cause disturbance to the amenity of a) regular water spraying of exposed areas to the construction phase.
the neighbouring land. suppress dust;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.