Attached to the e-mail MCU15/0122 Development Application - Engineering Services Assessment Email 5 of 5.
Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
b)provision of dust stabilised or sealed All disturbed areas will be stabilised should they
internal roads; be exposed for more than 2 weeks.
c)protective covering of exposed areas that
are left for more than 2 Filling and earthworks will only be undertaken
weeks; and between the hours nominated in S4.2.
d) if there is no valid development permit for the
site, disturbed areas are revegetated using
species identified in PSP3 - Landscaping
Plants and Guidelines;
AND
S4.2 Earthworks are undertaken only during the
hours of 7am to 6pm, Monday to Friday and 7am
to 6pm on Saturday. No work is undertaken on
Sunday or public holidays.
Vegetative Waste S5.1 Cleared vegetation is transported off- site RO5 Any vegetated waste encountered will
O5 for disposal in an approved green waste transported to an approved green waste
Vegetation cleared from a development site is disposal facility; disposal facility, mulched on-site for internal
disposed of in an environmentally responsible manner. OR landscaping, or disposed of for the purpose
S5.2 Cleared vegetation is mulched on-site and of firewood.
reused for landscaping of the finished
development;
OR
S5.3 Cleared vegetation is disposed of for the
purpose of firewood. (Note: Disposal of
vegetative waste by burning off is not an
acceptable method of disposal).
Managing contamination risk S6.1 The fill material is solid clean earth, free of RO6 Based on preliminary earthworks calculations
O6 putrescible or refuse material, vegetation, acid there will be more cut than fill therefore it is
Materials used as fill are suitable for development of sulfate soils, building or construction material or intended to use the existing site material. All
the land and filling or excavation works do not result in other material or contaminants; imported fill, if required, will only be clean.
the contamination of land. AND This requirement will be defined within the
S6.2 The site is not on the contaminated land construction documentation.
register. A search, to be performed by others, will
determine whether the land is on the
contaminated land register.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.