Council archive · source document
Engineering Services Assessment · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Engineering Services Assessment Email 5 of 5.
Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
Stormwater runoff S13.1 Diversion drains or bunds are designed RO13 Any external catchment runoff will be identified
O13 and constructed to drain upstream run-off and managed appropriately. Further details
Stormwater is diverted around disturbed areas. around the disturbed site; AND will be provided in an Erosion and Sediment
S13.2 Discharge from the diversion drains do Control Plan to be prepared by Morgan
not cause run-off impacts to other properties; Consulting Engineers.
OR
S13.3 Alternative methods, as described in the
Institution of Engineers Australia (Queensland
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites,
are used.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.